Lacoste Polo ShirtsThe main responsibility for thisLacoste Polo Shirts work is:Cooperate with sales and handle the CCTV’s project. The detail work include understand the customer’s need, design the system, write the proposals for the projects, draw the System chi hair straightener
Topology chi hair straightener
and wirte the price list. Follow the customer needs to write PPT.For some CCTV’s products, I have to join in the project group and responceable all the technical work in the project, even some implement work, such as installing and debugging the database, adjust the switch.
Involved the CCTV’s projects :1. Involved the Storage System Project of the CCTV new site:
a) Join in the design of themen's nike shoesmen's nike shoes
centery storage system, include build up the structure of the system, design the work flow, define the interface with other system.b) Communicate with some storage companies, compare their products and know their feature. All this is for the storage tests in next step.c) Write the storage test program and prepare the test equipment and the test environment.
d) Involved the test for the data safe, especially test the Continual Data Protect(CDP) technologh in different company.
e) Join the critical point report meeting of the storage system.2. Involved the News System Project of the CCTV New Site:
a) Responsible for deeply design the NDS, include: discuss the interface between the NDS, News Exchange Platform and NPM; investigation the customer’s need and estimation the load of the development.b) Responsible for analyse the function and the process for the Incepting System, the News Producting System and the News Including System.c) Design the Outside System for the CCTV news report.
d) Follow the customer’s request and make the bidding file for the News Exchange Platform.
e) Responsible for choosing the server and the storage’s type.f) Involved collecting the customer’s need for the News Outside System(the subproject of the News System Project), design the system’s structure and report to the project leader of CCTV.
3. Involved building the Eleventh National Games Reporting System for the CCTV:a) Collecting the customer’s need and design the system’s structure.b) Take charge some implement work, such as make the switch linking diagram, the server ranking diagram.
Involved other projects :1. Take charge in the remote Cataloging system design, include to design the structure of the system and writing the scheme.2. Take charge in the Media Management System for the Ministry of Railways.
3. Take charge in Design the HD News Production Network for the Zhong Shi Ti Yu Entertainment Company, include design the network structure and the connection to the CCTV Production Network.4. Involved design the Media Management System for the National Library.
5. Involved design the HD News Production Network for the Miyun Telvision.6. Involved design the HD News Production Network for the China Satellite Communications Corporation.7. Involved design the system of stations' digitization for the Tongzhou Telvision. http://www.britsoc.co.uk/phpbb
http://forums.eye.fi
http://www.emaildiscussions.com
http://www.crosci.com/forum
http://www.llas.ac.uk/forum
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment